Skip to main content

Cocoa Utilities Capital Improvement Program

  • Community
  • Departments
  • Doing Business
  • Services
  • Visitors
  • Your Government
  • You are here:
  • You are here

    Home

Photo Gallery

  • Surveying elevation and offset for 36" FE line entering valve vault

  • Peachtree Street

  • Ozone Contactor and Filter Building stairway

  • SW Clearwell p7

  • SW Clearwell P6

  • SW Clearwell P5

  • SW Clearwell P4

  • SW Clearwell P3

  • SW Clearwell P2

  • SW Clearwell p1

  • Line Stop Used When Existing Valves Don’t Work

    Line Stop Used When Existing Valves Don’t Work
  • BNR

  • BNR

  • Headworks and Odor Control

  • Headworks and Odor Control

  • Headworks and Odor Control

  • Clarifiers

  • Clarifier

  • Dyal Water Treatment Plant

    Dyal Water Treatment Plant
  • Sellers WRF – Reclaimed Water Piping

    Sellers WRF – Reclaimed Water Piping
  • Wewahootee Water Treatment Plant

    Wewahootee Water Treatment Plant
  • Temporary 6-inch Water Main for Testing

    Temporary 6-inch Water Main for Testing
  • Sellers Water Reclamation Facility

    Sellers Water Reclamation Facility
  • Large Diameter Gate Valve

    Large Diameter Gate Valve

Pages

  • 1
  • 2
  • next ›
  • last »

Search form

  • CIP Home
  • Utilities Capital Improvement Program
  • Water Supply
    • Raw Water Well Rehabilitation - FY 2020
    • Well 17 Pipeline Improvements
    • Little Econ to Wewahootee Road Raw Water Transmission Main
    • Well Field Monitoring System Upgrade
  • Water Treatment
    • Dyal Chemical Conversion & Reliability Improvements
    • SCADA Control System Upgrade - FY19
    • Surface Water Clearwell and Reject Pond Improvements
    • Sellers WRF Secondary Clarifier Rehabilitation
    • Cal Flow
    • Automatic Transfer Switch Replacement at TCR Pump Station
    • Drinking Water System E&IC Reliability & Automation Improvements - FY19
    • Dyal TTHM Prevention and or Reduction
    • Dyal Water Treatement Plan Server Uninterrupted Power Supply Upgrade
    • Dyal Water Treatment Plant SCADA Server, OS & Server Software Upgrade
    • Filter 1-4 Rehabilitation
    • Dyal WTP Closed Loop Transition
    • Filter Covers and Screens at Dyal WTP
    • 5MG Storage Tank Rehabilitation at Dyal WTP
  • Water Transmission and Distribution
    • Chase Hammock Road Looping Improvements
    • Merritt Island Booster Pump
    • Michigan Ave Force Main
    • SR-520 Distribution System Improvements
    • Fortenberry/Plumosa Water Main Improvements
    • Industrial Park Pump Station Upgrade
    • US-1 Widening Utility Relocation - FDOT
    • 36” Valves on SR-520 Water Main
    • Florida Ave Rosa L Jones Pipeline
    • Indian River Drive Distribution System Improvements
  • Wastewater Collection and Conveyance
    • Lift Station #04 Upgrade
    • Lift Station #14 Replacement
    • Indian River Lagoon Septic to Sewer (Zone J)
    • Indian River Lagoon Septic to Sewer (Zone K)
  • Reclaimed Water Transmission and Distribution
    • Future Project Placeholder

Return to Official Cocoa, FL Website

COCOA FLORIDA

The City of Cocoa
65 Stone St.
Cocoa, FL 32922
Ph: (321) 433-8800
Fx: (321) 433-8408
  • CocoaFL.org
  • Cocoa Utilities Capital Improvement Program Home
  • Photo Gallery
  • Calendar
  • Contact
  • Copyright Notices
  • Accessibility
  • Powered by Critigen