Michigan Ave Force Main

Current Statistics as of Sep. 27, 2019

Project Summary

The existing pipeline along US1 acts as a single point of failure in the CIty's collection stystem.  Also, an analysis of the wastewater collection system thru a hydraulic model revealed deficiency in this section.  This hydraulic deficiency can be resolved by installing approximately 2900 linear feet of 16" ductile iron (DI) pipe along Michigan Avenue (from Clearlake Rd. to US1).
 

Budget

Current Spent: $1,187,447
Budget: $1,187,447

Schedule